What we delivered.
The site, consisting of several buildings, required the installation of a new Category 6 structured cabling system to replace the existing Category 5e cabling network.
Comfinity installed a new Excel Category 6 structured cabling system throughout multiple of the colleges buildings, including; Hampton, Blythe, Brueton, Malvern and the Claire Hicks Sports Centre. Added to this, we installed a complete end-to-end basket containment system to support the new cabling requirements across the site.
Backed by a 25-year manufacturer's warranty, the new cabling system will support the requirements of all voice, data, wireless, CCTV and access control.